Projects that go down in history. German Chancellor Dr. Angela Merkel reiterated this during her visit at the Herrenknecht AG on October 7, 2019. On a tour of the plant premises, company founder and...
Dubai International Airport is the hub of air traffic in the Persian Gulf: nearly 90 million international passengers are handled here each year. The operators are constantly investing in capacity...
The final double breakthrough of the two Herrenknecht tunnel boring machines „Anna“ and „Magda“ (Double Shield TBM, Ø 9,900 mm) in the Norwegian Ski completed the excavation of both 20-kilometer-long...
In Singapore, a Herrenknecht tunnel boring machine (EPB Shield, Ø 5,250 mm) excavated two large drains for the Stamford Diversion Canal. The challenge: winding bottlenecks and an inner-city drive in...